Manufacturing Process
See how your custom tin packaging moves from artwork and samples to printing, forming, quality inspection and export.
A Factory Process Built Around Your Project
Shaoxing Juyuan Packaging Products Co., Ltd. combines 11 years of tin packaging experience with support for OEM and ODM projects. Our services cover design, plate making, printing, sampling, production, inspection and export customs clearance.
Choose an existing model or develop custom shapes, sizes, printing, embossing and inserts. The production sequence is planned around your approved sample.
How We Make Your Tins
Follow the key stages from approved artwork to finished tins ready for shipment.
Project Brief
Share the intended use, dimensions, quantity, artwork and destination market. We review suitable existing models or the need for a new mold.
Design & Sample Approval
Confirm structure, artwork, color proof and finishing details. Samples usually take 7–10 days, depending on the project.
Material Preparation
Tinplate is prepared and flattened for the production process. Material requirements are confirmed according to the intended packaging use.
Printing
Approved artwork is printed on metal sheets. Spot color printing and logo decoration can be specified during project planning.
Cutting
Printed sheets are cut into the components needed for the selected tin body, lid and base.
Forming & Assembly
Components are pressed and formed, then assembled into the approved shape. Embossing and other specified details are incorporated into the process.
Quality Inspection
Our QC team checks the tins before packing, including inspection along the automated production line.
Protective Packing
Finished tins are protected and packed into cartons according to the agreed packing requirements.
Warehousing
Packed cartons are organized in the warehouse, ready for the confirmed shipment schedule.
Loading & Export
Goods are loaded for shipment. Our team supports export customs clearance and keeps you updated with shipment information.
Plan Samples, Production & Delivery
7–10 Days
Typical sampling time. Timing depends on the design, mold and finishing requirements.
20–35 Days
Typical mass production time after sample approval and receipt of deposit. The final schedule depends on quantity and processes.
Project-specific MOQ
Existing ODM models generally allow lower quantities. New mold MOQ depends on tin size and manufacturing requirements.
Ready to Develop Your Custom Tin?
Send your reference design, size, quantity and destination market. Our team will help review the next steps.
